Executive Electric
call
Unfinished room with exposed ceiling wiring during a whole-house rewire

Whole-House Rewiring in San Jose, CA

Rewiring, remodel electrical, and new circuits for San Jose homes. We coordinate with your GC and pull permits. CSLB #1133790.

5.0 Yelp

Request a quote

Rewiring and Remodel Electrical for Occupied and Open Houses

Whole-house rewiring is the work of replacing outdated or damaged branch circuits so the house matches how it is used now. Remodel electrical is the same trade during a kitchen, addition, or full gut: new homeruns, new devices, and a panel that can carry the load.

Executive Electric does this for San Jose houses and for substantial remodels in Los Gatos, Saratoga, and nearby cities. We have been on jobs where walls are open, the GC is running a schedule, and the electrical has to land before insulation. We coordinate the rough-in, inspections, and trim so the remodel can keep moving.

Not every older house needs every cable replaced. Some rooms can keep sound NM if the devices, grounds, and protection are brought up. We assess before we demo a finished wall that did not need to come down.

Additions, ADUs, and garage conversions are part of the same service: new circuits, a subpanel when it is the honest design, and inspection. Commercial TI wiring is available but secondary.

Rewiring, Remodels, Additions, and New Circuits

The scope follows the house. A full rewire is for cloth, damaged cable, ungrounded rooms you want to use as a home office, or a gut remodel where the walls are already open. A kitchen or addition is often new circuits plus a panel conversation, not a tear-out of every bedroom.

Whole-house rewiring

New branch circuits, grounds, and devices through the living space, with a panel and directory that match the finished house.

Major residential remodels

Kitchens, baths, and open-plan work while the GC has the walls open. We rough in, inspect, and trim to their schedule.

Additions and renovations

New rooms, ADUs, and garage conversions with homeruns that do not overload the original panel.

New circuits and upgrades

Dedicated kitchen, laundry, EV, or HVAC circuits when the remodel adds load but the rest of the house can stay.

Panel upgrades during a remodel arrow_forward

Working With Your General Contractor

On a remodel, we need the GC's sequence: rough-in before insulation, trim after paint, inspection windows that are real. We attend the walk, mark boxes, and say when a beam, a duct, or a window move will change a homerun.

If you are the owner-builder, the same process applies. We still pull the electrical permit, meet the inspector, and will not cover work that has not been seen.

We do not bid a whole-house number from a photo. You get a scope after we see the open walls or a set of plans.

Remodel and Rewire Work We Handle

Assessment of existing wiring

What can stay, what has to go, and which rooms can be done in phases if the house stays occupied.

Rough-in and homeruns

Boxes, cable, and panel landing before insulation, with photos of walls we will not see again.

Device trim and labeling

Switches, receptacles, and a panel directory that matches the finished rooms.

Kitchen and laundry circuits

Code-required small-appliance, range, and laundry circuits on a remodel, not a shared bedroom run.

Subpanels for additions

When the original panel cannot take the new load, a subpanel is often cleaner than a stack of tandems.

Inspection and GC coordination

We schedule electrical inspections to the job's calendar and show up when the inspector does.

Assessment and Installation

  1. 01

    Walk the house or the plans

    We look at existing cable, the panel, and the remodel drawings. You hear what a full rewire versus a partial scope would mean.

  2. 02

    Written electrical scope

    Homeruns, devices, panel work, and permit items. No round number that hides the kitchen from the bedrooms.

  3. 03

    Rough-in

    Boxes and cable go in while walls are open. We leave the job ready for insulation and the rough inspection.

  4. 04

    Trim and final

    Devices, plates, and a labeled panel after finishes. Final inspection, then a walkthrough of the new circuits.

When Rewiring or Remodel Electrical Is on the Table

  • check The house still has ungrounded receptacles in rooms you use every day.
  • check A kitchen or addition is about to open and the existing panel has no spare ways.
  • check Cloth, damaged, or undersized cable shows up in a wall the GC already opened.
  • check You are adding an ADU, a garage conversion, or a second laundry.
  • check Breakers trip once the remodel loads are in, even though they did not before.
  • check Your GC needs an electrician who will pull permits and meet inspections.

Questions About Whole-House Rewiring in San Jose

Does every older San Jose house need a full rewire?

No. We look at the cable, the grounds, and how you use the rooms. Some houses need new kitchen and laundry circuits and can keep sound cable elsewhere.

Can you work while we live in the house?

Often, in phases. A full gut is easier when the house is empty. We will say which rooms go dark and for how long before we start.

Do you work under a general contractor?

Yes. We follow their schedule for rough, inspection, and trim, and we speak up when a framing change affects a homerun.

Will this include a panel upgrade?

Only if the load or the equipment requires it. See the panel upgrades page. We do not bundle a panel into every rewire quote by default.

Can you give a price from photos?

No. Rewire and remodel electrical depend on what is in the walls and on the drawings. We quote after a walk or a plan review.

Planning a rewire or a major remodel?

Send plans or a few photos of the open walls and the panel. We will talk through scope with you or your GC and send a written quote.